环氧地坪施工前对素地要求和施工前的准备

 (针对新混凝土或新水磨石基面)

养护期:28天以上,底层做过防水处理

粉光强度:300PSI(210kgf/cm 或C25)以上

含水率:8%以下

相对湿度:55%以下

平整度:2-3mm/2M以内

The requirements of the raw floor before construction

(For the fresh cement or terrazzo ground)

Maintaining period: over 28 days and no water any more (except the ground above the first floor)

Concrete strength: above 300PSI(210kgf/cm2 or C25)

Free water/cement ratio: under 8%

Relative humidity: under 55%

Level degree: within 2~3mm/2M

气候条件

空气湿度高于85%时,或气温在50℃以下,应避免施工。或改用其它低温耐湿产品。

Clim ate conditions

To avoid the surface of the floor dimming, whitening or not easy to dry, the construction shouldn`t be performedin the following conditions: rainy day、the air relative humidity above 85% or temperature under 10 degree. Another anti-low temperature and moisture-resistant material is alternative under the frustrated construction conditions.

场地准备

施工现场须清走所有杂物,最好避免交叉施工、禁止无关人员出入。

Ground preparation

Cleaning all the sundries in the construction field; Avoiding cross construction; Prohibiting all the irrelative from entrancing in.

地面预处理

地面如有少数地方潮湿,施工必须用瓦斯枪强制干燥;如有油污等,需用专用洗涤剂作清洁处理。

Ground pre-processing

If there are few damp spots, heating the ground with the gas-sprayer to make them dry. If there are oils, the special detergent should be used to clean.

 